End-to-end coordination of trades, timelines, safety, and quality across all phases of the project.
Level 3 - Internal Fit Out & Service Upgrades
Project Description
In May 2024, AWB was awarded the contract to deliver refurbishment works for the new Midwifery Birth Centre located on Level 2, A Block of Bentley Health Service. The centre was designed to provide a calm, family-oriented environment for expectant mothers with low-risk pregnancies, offering two birthing rooms and associated support infrastructure. The works were undertaken in a live hospital environment, requiring careful planning and execution to ensure surrounding clinical areas, including the Birth Centre Theatre, remained fully operational throughout. AWB successfully delivered the project within a live hospital setting, maintaining full operational continuity of adjacent clinical areas. The new Midwifery Birth Centre reflects a modern, welcoming aesthetic aligned with EMHS’s vision for patient-centred care.
Scope Summary
AWB’s scope included comprehensive demolition, construction, and services upgrades, comprising:
- Demolition & Removal: Removal of all redundant elements including vinyl flooring, coving, tiling, brick plinths, walls, joinery, windows, fittings, fixtures, ceilings, doors, door frames, and concrete scabbling
- Ceilings & Partitions: Installation of new partitions and ceilings including bulkheads, insulation, noggings, access panels, aluminium pressings, MDF boards, laminate panels, bitumen coatings, and acoustic wall panels
- Floor Coverings: Supply and installation of new vinyl flooring and wall/door vinyl, including floor preparation, coving, patterns, printing, and welding
- Glazing: Installation of 12.5mm acoustic laminated glass with aluminium framing, channels, and silicone joints
- Carpentry, Hardware & Fixtures: Installation of new timber doors, door hardware, acoustic seals, blinds, sanitary hardware, and accessories
- Painting: Surface preparation and painting of ceilings, walls, doors, and frames
- Ceiling Tiles: Installation of new ceiling tiles throughout
- Services: Electrical, hydraulic, and mechanical services upgrades
Key Deliverables
Transparent and proactive engagement with clients, consultants, and government bodies through regular updates and reporting.
Ensuring all works meet relevant codes and standards, including WHS, Access Aus (AS 1428), and environmental regulations.
Development and implementation of SWMS, risk assessments, and protocols for high-risk activities such as working at heights and asbestos removal.
Engaging and managing licensed trades and specialists, including asbestos removalists, concreters, roofers, and civil contractors.
Delivering works in operational schools, hospitals, offices, and public spaces with minimal disruption to occupants and services.
Dust suppression, noise mitigation, waste management, and secure site access to protect people and property.
Coordination with Licensed Asbestos Assessors and Occupational Hygienists to obtain clearance certificates and occupancy permits before re-entry.
Final inspections, punch list resolution, and delivery of completion documentation including warranties and maintenance guidance.
Project Overview
CUSTOMER
East Metropolitan Health Services
PROJECT VALUE
$1.5k-$ 1.6m
YEAR COMPLETED
March , 2025